![Dzerzhinskaya CHPP Strengthens Shores of Drainage Channel](https://novostienergetiki.ru/show_image_Bn75x75.php?filename=/2012/08/dzerzhinskzya_now.jpg&cat=5&pid=27177&cache=true)
In Dzerzhinskaya combined heat and power plant of the Nizhny Novgorod branch of OJSC «TGC-6» (controlled by IES-Holding) implements an investment project to strengthen the banks open drainage channel. The drainage channel with thetwo road bridges, a siphon well, a multi-step cascade weir has been in operation since 1961. This is an artificial construction of […]