After capital repairs 72 overhead lines 35-110 kV with the total length of almost 370 km, in which 254 transmission towers and 55 km of wires have been replaced. Over 1000 km of overhead lines 0.4-10 kV have been repaired, 14 transmission towers have been installed, 1.2 thousand km of wires have been replaced. Complex […]