Due to the worsened weather conditions 51 brigades with the total number of over 600 people of in-house personnel of MES Volga as well as the attracted subcontractor organizations and 401 units of equipment. The branch of OAO FGC UES – Main Electrical Grids of Volga have introduced the high alert regime at the facilities […]
A high alert regime was introduced in the power utilities of Sochi in order to provide the Olympic objects with electricity and to ensure timely response to emergency situations. The emergency response center, which is personally headed by Oleg Budargin, the head of FGC UES (Federal Grid Company of the Unified Energy System) is controlling […]