On January 17 at 10:52 Moscow time the capacity of the generating set at the Leningradskaya power plant was reduced by 500 MW due to a preliminary request. In compliance with the permission obtained in advance the turbogenerator #3 was disconnected from the network. The officially disclosed reason for that is the fault in the […]