MES of West Siberia Completed the repairs of the second autotransformer with the capacity of 125 MWA at the substation 220 KW Kosmos (the Khanty-Mansiisk autonomous district — Yugra). The works were conducted within the framework of the repair campaign 2012. The substation 220 KW Kosmos with the transformer capacity of 250 MVA was commissioned […]