Within the framework of the execution of measures aimed at repairing grid equipment the power engineers are planning to repair 487.1 km of overhead power transmission lines with the voltage rate of 10 kv, 268.6 km of OL with the voltage of 33 kv, 16 km of OL with the voltage of 10 kv and […]
MES South is going to build about 1300 km of overhead power transmission lines till 2016 within the framework of the investment program of FGC UES. The works are to be conducted in compliance with the Diagram and Program of the development of UES of Russia for 2011-2017. The plans include the construction of five […]