Within the framework of the execution of measures aimed at repairing grid equipment the power engineers are planning to repair 487.1 km of overhead power transmission lines with the voltage rate of 10 kv, 268.6 km of OL with the voltage of 33 kv, 16 km of OL with the voltage of 10 kv and […]