Within the framework of the preparation for the heating season 2012/2013 the branch of OAO FGC UES _ Main Electrical Grids of the East – is to inspect the technical state of power facilities 220-500 kv in the Khabarovsk Territory, Amur region and the Republic of Sakha (Yakutia). The total length of the power transmission […]