OAO Bryanskenergosbyt launched a gas boiler house with the capacity of 30 MW in the town of Seltsovo.
The power engineers got into working trim the equipment of the boiler house, prepared the heat supply network and launched the boiler house. As the director of OAO Bryanskenergosbyt Oleg Nosov declares, “The boiler house is fitted with the most up-to-date German energy-efficient equipment.
It is computer-aided to the maximum degree and has the highest efficiency (92%) of all the similar facilities”. The new boiler house which costs 65 million rubles will provide heat for 18 thousand residents of the town of Seltsovo.
Метки: boiler house, Bryanskenergosbyt, Energy Efficiency, Russian energy industry news
Интересная статья? Поделитесь ей с друзьями: