Показаны все новости по тегу ‘electricity’


Equipment for Sayano-Shushenskaya Hydro Power Plant Arrives In Krasnoyarsk

Equipment for Sayano-Shushenskaya Hydro Power Plant Arrives In Krasnoyarsk

A river-sea class vessel with large-size heavy equipment for the Sayano-Shushenskaya hydro power plant arrived in Krasnoyarsk. At present it is being unloaded in the river port of Peschanka. According to the press-service of RusHydro, the vessel which arrived at Peschanks is carrying three sets of large-size equipment each of which consists of a impulse […]

6 Month of Corrective Labour for Electricity Thefts

6 Month of Corrective Labour for Electricity Thefts

In Yurga district of Kemerovo region two villagers have been confined to 6 month of corrective labour each for the unwarranted link-up to the electrical grids of the branch the Interregional Distribution Grid Company of Siberia – Kuzbassenergo – Distribution Zone. The convicted persons will have to pay back to the company more than 4 […]

Repairs of Overhead Line 500 kV Troitskaya State District Power Station – Magnitogorskaya Completed

Repairs of Overhead Line 500 kV Troitskaya State District Power Station – Magnitogorskaya Completed

MES Ural completed the repairs of the overhead line 500 kV Troitskaya state district power station – Magnitogorskaya. As a result of the works executed within the framework of MES Ural repairs program the reliability of electricity transit from the Chelyabinsk power grid to the power grid of Bashkiria. In the course of the works […]

Employees of Belgorodenergo Install 60 thousand ‘clever’ energy meters

Employees of Belgorodenergo Install 60 thousand ‘clever’ energy meters

The engineers of the IDGC of Center branch – Belgorodenergo installed a ‘jubilee’ intelligent energy metering device # 60 000. The owner of the ‘clever’ meter is the resident of the Bessonovka village in Belgorod region Sergei Buzina. “I regularly watch TV, read newspapers and I am in the know of all changes that take […]

Kransoyarskenergo Creates Emergency Reserve

Kransoyarskenergo Creates Emergency Reserve

With the aim of tracing and mitigation of the possible emergency situations the enterprise Krasnoyarskenergo has created a centralized emergency reserve in the amount of 38.4 million rubles. Altogether Krasnoyarskenergo is going to spend 438 million rubles on preparation to the autumn and winter period. The emergency reserve includes: — power transformers 6-110 kilovolt – […]

Small Scale Energy Generation Program in Altai to Include Five Mini Hydro Power Plants

Small Scale Energy Generation Program in Altai to Include Five Mini Hydro Power Plants

The representatives of JSC RusHydro supported the suggestion of the head of the Republic of Altai of including five mini hydro power plants into the investment program of the small scale energy generation development of the region; the additional agreement on this is to be signed in September, a press-office of the Republic of Altai […]

Energy Equipment Thieves Caught in Rostov Region

Energy Equipment Thieves Caught  in Rostov Region

The staff members of the distribution grid company and the officers of the fuel and energy industry subdivision of the industry department in the Directorate for Combating Economic Crimes of the Central Internal Affairs Directorate in the Rostov Region took in custody a group of malefactors attempting another one in a series of state property […]

MES South Builds Substation Control House at Buzhora Substation

MES South Builds Substation Control House at Buzhora Substation

The branch of the Federal Grid Company of Unified Energy System (JSC FGC UES) — MES South completed the construction of the control house at the substation 220 KW Buzhora in the Anapa district of the Krasnodar Territory. The new power facility will solve the problem of energy deficit in the Anapa district as well […]

Thunderstorm Causes Power Cut

Thunderstorm Causes Power Cut

Due to the thunderstorm front in the Leningrad Region 12 thousand people were left without electricity. A thunderstorm which broke out yesterday in the Leningrad Region caused point power cuts. As a result in the morning the residents of the six municipal districts – Kingiseppskiy, Gatchinskiy, Slantsevskiy, Luzhskiy, Lomonosovskiy and Volosovskiy (12 thousand people in […]

© 2026 «Новости энеретики»
г. Москва
Тел.: (495) 540-52-76
Карта сайта

Перепечатка материала с сайта без разрешения Редакции запрещена. За содержание новостей, объявлений и комментариев, размещенных пользователями сайта, редакция журнала ответственности не несет. Вся информация носит справочный характер и не является публичной офертой.

Яндекс.Метрика Яндекс цитирования